BEFESA ZINC ASER Turnkey Project



Client: BEFESA Zinc Aser.

Project: Design, manufacture and fitting of a Refrigeration Tower, kiln and dual exhaust flue system section.

Total Weight: 150 Tonnes.

Materials: 16 Mo 3, AISI 321 and H II.

Buzzard Proyect

Client: DRAGADOS (ENCANA)

Project: Manufacturing of a tubular structure, supported by reinforced welded ferrules.

Total Weight: 1,250 tonnes.

Material: P-460

Active participation in the production of a tubular platform structure in the North Sea and the mast for the crane. Pipes with a diameter of 1200 mm and are between 30 and 75 mm thick with base materials P-460. Their lengths vary between 3 and 16 meters.

 

Qatar and Tianjin Projects

Client: Babcock Power Spain

Project: Manufacturing of ferrules and cones from 46 to 80 mm thick.

Total Weight: 2,000 tonnes

Material: 20 Mn Mo Ni 4-5

Shaping and welding of the ferrules for the 36 boilers at the Qatar project in thicknesses of 46 and 80 mm with lengths of up to 3,250 mm per ferrule.

 

Molins New Cement Line Project

Client: F.L. Smidth

PROJECT: Complete replacement of the Cement Line and new Kiln supply.

Total Weight: 600 tonnes.

Material: 16 Mo 3

Manufacturing of a complete cement kiln that is 56 meters in length and 5.2 meters in diameter, for thicknesses of between 30 and 95 mm. The ferrules placed under the rings have a mechanism to ensure the correct adjustment of the rolling rings, which are supplied by our client.

 


1

 

Lasted news

MIDEST 2010

21-07-2010 Talleres Berasategui will be one of the exhibitors at the 2010 MIDEST from the 2nd to the 5th of november 2010 in Paris. Our Stand will be in HAll 6 AISLE G STAND 154. read more >>

BENDING CAPACITY RAISED BY 80%

15-12-2009 January 2010 will see the start-up of a new sheet bender with a total capacity of 1500 tonnes. This investment will increase our cold bending capacity by 80% and our hot bending capacity by 300%. Th... read more >>

DELIVERY OF TURNKEY PLASTER KILN

01-09-2008 On 20 August we finalised the replacement of the plaster kiln at Saint Gobain Placo Iberica´s plant in San Martin de la Vega after a 6-month manufacture period at our workshop and an assembly pe... read more >>